Mattern & Craig designed the replacement of the existing structure which was a single-span steel girder structure that was structurally deficient with a bridge structure with appropriate dimensions to satisfy both the required clear roadway width and hydraulic capacity.  To accomplish this work Mattern & Craig provided engineering services for the design of the bridge work including preparation of plans and bid documents; bid assistance for a unit price contract; and construction administration and inspection.  Services also included surveying, preparation of property easement plats, preparation of applicable permits (TDEC and Corps of Engineers/TVA), erosion prevention and sediment control, and establishing all signage and markings in accordance with applicable regulations.  We also coordinated with and provided submittals to TDOT, per the State Aid Bridge Guidelines.

 

Before Construction

 

 

During Construction

 

  Rowdy Dogs Farm

 

The Finished Product